{"id":4017,"date":"2015-11-30T16:14:17","date_gmt":"2015-11-30T21:14:17","guid":{"rendered":"http:\/\/randpc.com\/blog\/?p=4017"},"modified":"2015-11-30T17:34:47","modified_gmt":"2015-11-30T22:34:47","slug":"ask-our-experts-construction-contracts","status":"publish","type":"post","link":"https:\/\/m.randpc.com\/blog\/ask-our-experts-construction-contracts\/","title":{"rendered":"Ask Our Experts: Construction Contracts"},"content":{"rendered":"<p>Once the various elements of a construction project are in place\u2014the budget and timeline have been approved, the contractor selected, and work permits obtained\u2014the remaining step is for the building owner and the contractor to sign an agreement so the work can begin. It\u2019s here that the project can get delayed by drawn-out negotiations between the parties.<\/p>\n<p><span style=\"font-weight: 400;\">In RAND\u2019s<\/span><a href=\"http:\/\/www.randpc.com\/videos\/#aoe\" target=\"_blank\"> <span style=\"font-weight: 400;\">Ask Our Experts<\/span><\/a><span style=\"font-weight: 400;\"> video series, R<\/span><span style=\"font-weight: 400;\">AND President Stephen A. Varone, AIA discusses how to get an <a href=\"https:\/\/www.randpc.com\/videos\/contracts\" target=\"_blank\">owner-contractor agreement<\/a> done in an effective and efficient manner including using an industry-standard contract and which items should be added to protect the owner\u2019s interest.<\/span><\/p>\n<p><iframe loading=\"lazy\" src=\"\/\/www.youtube.com\/embed\/2sl7ywgnBls\" width=\"425\" height=\"350\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<p><span style=\"font-weight: 400;\">To view other videos of RAND\u2019s experts addressing building issues ranging from<\/span> <a href=\"https:\/\/randpc.com\/videos\/alterations\" target=\"_blank\"><span style=\"font-weight: 400;\">apartment alterations<\/span><\/a><span style=\"font-weight: 400;\"> to <\/span><a href=\"https:\/\/randpc.com\/videos\/infrared\" target=\"_blank\"><span style=\"font-weight: 400;\">diagnosing building conditions with infrared thermography<\/span><\/a><span style=\"font-weight: 400;\"> to<\/span><a href=\"http:\/\/www.randpc.com\/videos\/surveys\" target=\"_blank\"> <span style=\"font-weight: 400;\">building surveys<\/span><\/a><span style=\"font-weight: 400;\">, please visit our<\/span><a href=\"http:\/\/www.randpc.com\/videos\/#aoe\" target=\"_blank\"> <span style=\"font-weight: 400;\">Ask Our Experts<\/span><\/a><span style=\"font-weight: 400;\"> page on our website.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you have a building repair\/upgrade question you would like RAND to address, please contact us at 212-675-8844; <a href=\"mailto:&#x69;&#x6e;&#x66;&#x6f;&#x40;&#x72;&#x61;&#x6e;&#x64;&#x70;&#x63;&#x2e;&#x63;&#x6f;&#x6d;\" target=\"_blank\">&#x69;&#x6e;&#x66;&#x6f;&#x40;<span class=\"oe_displaynone\">null<\/span>&#x72;&#x61;&#x6e;&#x64;&#x70;&#x63;&#x2e;&#x63;&#x6f;&#x6d;<\/a> and our experts will be happy to answer it.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Once the various elements of a construction project are in place\u2014the budget and timeline have been approved, the contractor selected, and work permits obtained\u2014the remaining step is for the building owner and the contractor to sign an agreement so the...<\/p>\n <span class=\"read-more\"><a href=\"https:\/\/m.randpc.com\/blog\/ask-our-experts-construction-contracts\/\" class=\"more-link\" title=\"Read More\"><strong>Read more<\/strong><\/a><\/span>","protected":false},"author":13,"featured_media":4019,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[381,7,25],"tags":[380,382,383,371,368],"class_list":["post-4017","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contractors","category-categories","category-randpcs-better-building-videos","tag-construction","tag-construction-contracts","tag-contractors","tag-rand","tag-rand-architecture-engineering"],"_links":{"self":[{"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/posts\/4017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/comments?post=4017"}],"version-history":[{"count":0,"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/posts\/4017\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/media\/4019"}],"wp:attachment":[{"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/media?parent=4017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/categories?post=4017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/m.randpc.com\/blog\/wp-json\/wp\/v2\/tags?post=4017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}